1
Mining Weekly.com Browse Help
 
Intelligence on mining
 
 
Back

Copper Mountain production in line with expectations

By:  
 
BASE METALS
The Copper Mountain mine, in southern British Columbia, performed in line with expectations in the quarter ended September 30, producing 18.3-million pounds of copper 7 500 oz of gold and 64 900 oz of silver. The company has guided that the third-quarter copper production would be 10% lower than the second quarter, owing to lower copper grades being mined. Actual production was 8.5% lower than the second quarter, TSX- and ASX-listed Copper Mountain Mining reported on Thursday.
 
 
 
 
 

Latest content...

Register for daily alerts on news as it breaks in various key economic sectors - Click here to register