1
Mining Weekly.com Browse Help
 
 
 
Limit search to:
Start Date   
End Date   
 
 
 
SELECT a_id, a_id_word, a_headline, a_publish_date, a_abstract, a_author, a_has_video, a_has_audio FROM su_cat_sg_mappings, re_categories , re_category_sections_assoc , pr_sections , pr_article_section_assoc , pr_articles_search, pr_article_media_assoc WHERE csg_sg_id = 1 AND csg_cat_id = cat_id AND a_status = 1 AND a_process_status = 4 AND a_expiry_date >= 1529312400 AND cat_id = scat_cat_id AND scat_s_id = s_id AND s_id = ase_s_id AND ase_a_id = a_id AND cat_re_id = 43 AND ama_a_id = a_id AND ama_mt_id = 2 AND ama_p_id = ase_p_id AND s_id NOT IN (14903,14910,14911,14906,14904,14912,14909,14908,14907,14905) AND a_publish_date <= 1529312400 AND ase_s_id IN (13786,13947,13787,13788,13789,13790,13791,13792,13793,13946,13979,13980,13981,13982,13983,13984,13978,13986,13985,13987,13989,13988,13990,13991,13992,13993,13994,13995,13996,13997) GROUP BY a_id ORDER BY a_publish_date DESC LIMIT 0, 250
Desert Lion Energy Phase 1 flotation plant, Namibia Desert Lion Energy Phase 1 flotation plant, Namibia
Published: 15 Jun 18
Desert Lion Energy plans to build a flotation plant at its lithium operations in Namibia.
Timok upper zone copper/gold project, Serbia Timok upper zone copper/gold project, Serbia
Published: 15 Jun 18
Nevsun Resources has started construction of the exploration decline at its Timok upper zone copper project.
Thunderbird mineral sands project, Australia Thunderbird mineral sands project, Australia
Published: 15 Jun 18
The project has been granted environmental approval.
Toledo hot-briquetted iron production plant, US Toledo hot-briquetted iron production plant, US
Published: 15 Jun 18
Cleveland-Cliffs’ is building its first hot-briquetted iron production plant in Ohio.
Ammaroo phosphate project, Australia Ammaroo phosphate project, Australia
Published: 15 Jun 18
A feasibility study has determined that the project is technically feasible and will deliver positive economic benefits if developed in accordance with the prescribed design criteria.
Sal de Vida lithium/potash project, Argentina Sal de Vida lithium/potash project, Argentina
Published: 15 Jun 18
An updated definitive feasibility study has validated Sal de Vida as a technically superior, highly profitable long-life and low-cost lithium/potash project.
Macmillan Pass project, Canada Macmillan Pass project, Canada
Published: 15 Jun 18
Fireweed Zinc plans to start a large drilling campaign to upgrade priority zones at the Macmillan Pass project to measured and indicated resources.
Cove gold/silver project, US Cove gold/silver project, US
Published: 15 Jun 18
The results of a preliminary economic assessment have supported Premier Gold’s plan for the construction of an exploration ramp to further define and expand the deposits at the Cove project in advance of a future feasibility study.
Solwara 1 seafloor copper/gold project, Papua New Guinea Solwara 1 seafloor copper/gold project, Papua New Guinea
Published: 15 Jun 18
Nautilus Minerals has started wet testing its new seafloor diamond drill rig.
Pilgangoora lithium/tantalum expansion project, Australia Pilgangoora lithium/tantalum expansion project, Australia
Published: 15 Jun 18
Pilbara Minerals has started commissioning of the concentrator at its Pilgangoora lithium/tantalum project.
1
2 3 4 5 6 7 8 9
 
 
 
 

Latest content...

Register for daily alerts on news as it breaks in various key economic sectors - Click here to register
Close